Recent legislation will soon have a binding effect on the washout generated by concrete trucks and concrete pumps. In the past, this washout would be left onsite or pumped into an onsite waste container. Such events left an untidy construction site and increased the cost of waste disposal. Additionally, the wastewater generated by the washout was an extreme environmental problem if not handled correctly. (wash-out water has a pH level equal to Liquid Drano.) With a Freedom Waste CWC on site, the mess and waste of pouring concrete will forever be a memory. Concrete is easily recycled, and Freedom Waste can offer an extremely low rate on the CWC service. (Prices are determined by the distance between the project and the recycler.)
Let Freedom Waste Services put an end to your washout problems once and for all! |